Projects

   
 
 

Over the years, Tronnes Surveys has been chosen to provide survey services for some of the most expansive and expensive transportation and engineering projects in Alberta. For example:

  • The Glencoe Storm Project, a 900m tunnel under 27th Avenue SW
  • Royal Oak (Calgary) subdivision development
  • The Northwest Stoney Trail (NWST) and Northeast Stoney Trail (NEST) ring roads.

    We invite you to explore these and other examples of our most notable and exciting surveying solutions.

    Development
     Royal Oak (Calgary) : Eight (8) phases of Royal Oak for Acera Development. All topographical and legal surveys for subdivision development (1998-2005)
     Sheep River (Okotoks) : All phases since Phase 7 (1995-2006)
     Hampton Hills (High River) (2005-2006) Phase 1 of a 9 phase development expected to be complete by 2015
     The Hamptons (Medicine Hat) (2005-2006) Phase 1 of a 7 phase development expected to be complete by 2012
     Pointe of View (1997-2006) : Over two dozen condominium developments.
    Tronnes Surveys provides legal survey services to hundreds of land owners throughout Southern Alberta each year.
     
    Commercial and Infrastructure
     Glencoe Storm Project (2005-2006) : 900 meter tunnel under 27th Ave SW. Provided control, ground monitoring, laser alignment and vertical control for Tunnel Bore Machine.
     RWIS : Alberta Infrastructure Weather Information System.(2005-2007) : All survey services and traffic accommodation for design and location of weather towers for Highway conditions.
     Bow River Outfall (Strathmore) (2005-2006) : Legal survey for 18km gravity line from the Town of Strathmore to the Bow River.
     Livingston Place Towers (2005-2006) : Complete survey for design. Construction staking for horizontal and vertical control lines. Shoring wall monitoring through to main floor construction.
     
    Transportation
     Crowchild Trail and 50th Avenue SW Interchange (2002-2003) : Complete survey services for design and construction
     Stoney Trail Functional Design Control and Creek/Rail Crossings (2003)
     East Freeway Functional Centreline survey and Geotechnical locating (2003-2005)
     South Calgary Ring Road Bridge Design Surveys (2005-2006)(HDS)
     Stoney Trail : Component B Team : Complete survey services for design and construction at the following interchanges along Stoney Trail
     
  • Trans Canada Hwy (2003-2007)
  • Scenic Acres Link/Tuscany (2004-2007) (HDS)
  • Crowchild Trail (2004-2007) (HDS)
  • Deerfoot Trail (2004-2007) (HDS)
  •  Alberta Children's Hospital Interchange : Complete survey services for design and construction (2004-2006). Preliminary survey using HDS
     CP Rail WestCAP project (2004-2005) : 40 km of asbuilt rail survey and 29 km of construction staking for new rail.
     Bow City Bridge/Hwy 539 Widening (2003-2005) : Survey for design and bridge control.
     Deerfoot Trail and McKenzie Blvd Interchange (2002-2004) : Complete construction and asbuilt survey services
     Deerfoot Trail and 130th Avenue SE Interchange (2003-2005) : Complete construction and asbuilt survey services.
     37th Street/Fish Creek (2005) : Asbuilt survey of new road construction from Anderson south to Fish Creek Bridge (HDS)
  •  

     

       
       
             
    Copyright © 2012 Tronnes Surveys (1976) Ltd. Design and Hosting by Tech To U